Log in
Articles/Operator's read

DP World starts a dedicated export rail for ONE from Delhi to Mundra

Photo: DP WORLD
Photo: DP WORLD

Miss the Mundra cut-off for East Africa and your box waits a week

What it takes for a train carrying only ONE's containers to make ONE's vessel cut-offs at Mundra, and the sign that will show whether it does.

Portside Report·17 Nov 2026·2 min
Executive summary

DP World now runs a twice-weekly export train in India that carries only ONE's containers from the Delhi region to Mundra port. Because every box is for one line, the train can leave on a day set by ONE's vessel cut-offs. That works only if the train fills, keeps its rail path and reaches the right quay, and the ships keep their own schedule.

DP World has started a twice-weekly export train from the Delhi region to Mundra, on India's Gujarat coast. It carries only containers booked with Ocean Network Express (ONE), up to 180 TEU per departure. Both companies say the departures are aligned with ONE's vessel schedules. A train carrying several lines' cargo cannot offer that.

The alignment depends on the train filling. Two departures make up to 360 TEU a week of ONE exports. When a rake is short, the operator is tempted to wait for cargo. Once a train is held for cargo, it is no longer timed to a vessel. The coverage does not say who carries the cost of an empty slot.

What would a held train lose? A common-user train carries boxes for several lines, bound for different vessels on different days. It runs to a fixed timetable or when the rake is full. Either way, the timing suits no single ship. Some boxes reach Mundra days before their vessel and sit in the yard. Others arrive after the cut-off and roll to the next sailing.

With one line on board, the planner can work backwards. Start from the vessel cut-off at Mundra. Subtract the time to work the train at the terminal, then the rail transit. What is left is the departure time. From that come the cut-offs at the three DP World inland container depots where the train loads: Panipat, Pali and Modinagar.

ONE has more of those Mundra cut-offs to make than it had in the summer. In September it started two weekly services to East Africa: the IMM to Mombasa in Kenya, and the IMD to Dar es Salaam in Tanzania. Both call at Nhava Sheva, near Mumbai, then at Mundra, and then cross. Mundra is the last Indian port on each loop. A box that misses the cut-off there waits a week.

The first evidence will be in ONE's customer advisories. If the depot cut-offs at Panipat, Pali and Modinagar are each tied to a named vessel and voyage, the train is being planned from the ship backwards. If the departure day starts to drift with the bookings, the service has become an ordinary train with one customer.

Primary sources

Keep reading

All articles →

Portside Report, by email.

What each development changes on the quay, on board and in the schedule. Free to read. No paywall.

Weekly. One click to leave. Privacy